Inmaa energy projects Co. Ltd.
  • Home
  • Projects
    • Garraf Maint / Petronas
    • Gas-Over-Oil Actuators
    • Um Qasr Gas Exp. Terminal
  • About Us
  • Contact Us
  • More
    • Home
    • Projects
      • Garraf Maint / Petronas
      • Gas-Over-Oil Actuators
      • Um Qasr Gas Exp. Terminal
    • About Us
    • Contact Us
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Inmaa energy projects Co. Ltd.

Signed in as:

filler@godaddy.com

  • Home
  • Projects
    • Garraf Maint / Petronas
    • Gas-Over-Oil Actuators
    • Um Qasr Gas Exp. Terminal
  • About Us
  • Contact Us

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Innovative Oil and Gas Field Equipment

Project Highlight: Rotork Actuators & Master Station Commissioning – Um Qasr Jetty 2 (July 2024)

 

In July 2024, Inmaa Energy Projects successfully executed the commissioning of 25 Rotork actuators and a Rotork Master Station System at the Um Qasr Jetty 2 Gas Export Terminal for Basra Gas Company (BGC). The project was delivered under a specialized service agreement between Wood Company and Rotork Middle East, with Inmaa serving as the primary field execution partner.

A critical element of this assignment involved the integration of the Rotork Master Station with the site’s Yokogawa Distributed Control System (DCS). This phase required extensive signal testing, communication mapping, and collaborative coordination with Yokogawa control engineers and site automation personnel to ensure seamless data exchange and reliable control functionality.


Scope Highlights:


  • Functional commissioning of 25 Rotork actuators using PAKSCAN proprietary technology
     
  • Configuration and integration of Rotork Master Station and testing ring bus failover
     
  • Field-to-DCS testing for signal reliability and command response
     
  • Live operational simulations and loop verification with Yokogawa team
     
  • Compliance with stringent health, safety, and environmental standards

Commitment to Safety and Professionalism

 Inmaa’s engineering team conducted all works with technical excellence and strict adherence to HSE protocols, ensuring smooth integration with the terminal’s export control systems and achieving full operational readiness without incident. 

A Milestone in Services Partnership

 

This milestone project reflects Inmaa’s growing role in automation commissioning and advanced control system integration across Iraq’s strategic energy infrastructure.

Copyright © 2025 Inma'a company for energy projects Ltd. - All Rights Reserved.

Powered by

  • Privacy Policy
  • Contact Us

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept