Inmaa energy projects Co. Ltd.
  • Home
  • Projects
    • Garraf Maint / Petronas
    • Gas-Over-Oil Actuators
    • Um Qasr Gas Exp. Terminal
  • About Us
  • Contact Us
  • More
    • Home
    • Projects
      • Garraf Maint / Petronas
      • Gas-Over-Oil Actuators
      • Um Qasr Gas Exp. Terminal
    • About Us
    • Contact Us
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Inmaa energy projects Co. Ltd.

Signed in as:

filler@godaddy.com

  • Home
  • Projects
    • Garraf Maint / Petronas
    • Gas-Over-Oil Actuators
    • Um Qasr Gas Exp. Terminal
  • About Us
  • Contact Us

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

Project Highlight: Commissioning of Gas-over-Oil Actuators –

Heavy-Duty Pumps

 

Inmaa Energy Projects proudly contributed to the KAR Group’s Gas-to-Home Pipeline Project in Erbil, providing commissioning and calibration services for Rotork’s Gas-over-Oil actuators under a service engagement tied to Rotork's contract with KAR Group.

As part of this strategic infrastructure development aimed at extending domestic gas supply in Erbil, Inmaa’s engineering team was tasked with the commissioning of five main Shutdown Valves (SDVs) equipped with Gas-over-Oil actuator systems. These advanced actuators are specifically designed for pipeline applications where high torque and fail-safe operation are critical.

Durable Valves

 

Technical Insight: Gas-over-Oil Actuator Systems

Gas-over-Oil actuators utilize pipeline gas as the power medium but operate with the smooth response and control advantages of a hydraulic actuator. This makes them ideal for remote, high-pressure pipeline shutdown operations, ensuring rapid stroke times, fail-close safety features, and reliable performance in rugged environments—precisely the demands of KAR Group’s distribution network in northern Iraq.

Oil and Gas Field Equipment Solutions

Inmaa's Scope of Work:

 

  • Functional commissioning of five Rotork Gas-over-Oil actuator systems
     
  • Calibration and stroke timing configuration for SDVs
     
  • Testing of actuator performance under operational pressure
     
  • Close collaboration with KAR Group automation engineers
     
  • Full compliance with project HSE requirements
     

The commissioning was completed with utmost professionalism, attention to detail, and full alignment with health, safety, and environmental protocols. This project underscores Inmaa’s ability to manage technically demanding actuator configurations and support mission-critical infrastructure across Iraq’s evolving gas transmission grid.

Copyright © 2025 Inma'a company for energy projects Ltd. - All Rights Reserved.

Powered by

  • Privacy Policy
  • Contact Us

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept